Full Road Closure – Township Road 582 – between Range Road 240 and Range Road 241

Start date: 07/03/2024

End date: 07/11/2024

Location: Township Road 582 – approximately 60m east of Range Road 241 (bridge work)

Description: Transportation & Engineering Services has contracted Bridgemen Services to perform bridge maintenance on BF72394 located on Twp Rd 582 approximately 60m east of Rge Rd 241. This work will require a full road closure for approximately 7 working days July 3 to 11, 2024 weather permitting. And there will be a one lane closure in the same area during the week of July 15, 2024 until the project is complete.
There will be no through traffic on Twp Rd 582 between Rge Rd 240 and Rge Rd 241 during the initial full road closure.
Traffic accommodation will be in place, please obey all signage and drive safe!

Detour: Residents from the bridge work area and west on Twp Rd 582 must access to and from Rge Rd 241 and south to Twp Rd 580.
Residents east of the bridge work area at 24028 Twp Rd 582 and east must access to and from Rge Rd 240 and south to Twp Rd 580.

Scroll to Top